Completion inside the first floor of school building and the outside painting were completed mostly and were the position which can be used. The second floor of school building is doing wall accumulation and window frame making. 20211216
校舎一階の内部仕上げと外部塗装はほぼ完了し、使用できる状態となりました。校舎二階は壁積みと窓枠作りを行っています。2021年12月16日